Click here to make tpub.com your Home Page

Page Title: Table 7-2. Application of Materials for Blocking and Tiedown of Forklifts on CONUS General-Purpose Flatcars (Figs 7-1 thru 7-...
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 55-3930-243-14
Table 72. Application of Materials for Blocking and
Table 72. Application of Materials for Blocking and
Tiedown of Forklifts on CONUS General-Purpose Flatcar
Tiedown of Forklifts on CONUS General-Purpose Flatcar
(Figs 7-1 thru 7-5)
(Figs 7-1 thru 7-5) -- Continued
No.
No.
Application
Application
required
required
Item
Item
or provision and appropriate stake
Brake wheel clearance. Minimum
A
pocket (detail 3, fig 7-5). Wire-rope
clearance required is 6 in. above, in
ends should overlap a minimum of 24
back of, and on both sides of, and 4 in.
underneath wheel.
in.
H
20
Clamps. Place four on each wire rope
8
Blocks (detail 1, fig 75). Locate one
B
at the overlap area, and space 3
against the front and rear of each
wheel.
inches apart with a minimum of 6
inches from ends of cable. Place one
16
Side cleat. Each to consist of one piece
C
clamp under each stake pocket and
of 2 x 4 x 20in. lumber. Locate
shackle to secure wire rope and thim-
one piece on each side of each item B.
ble together (detail 3, fig 7-5).
Secure to car floor with six 30d nails.
J
6
Thimbles. Place one at bottom of each
End cleat. Each to consist of two pieces
8
D
stake pocket (4) and each front shack-
of 2 x 4 x 12in. lumber. Locate
le, item K, where used.
one against end of each item B. Se-
K
2
Shackles. Attach one to each front tie-
cure lower piece to car floor with four
down provision, RTL10 and RTL10-
30d nails and top piece to lower piece
1 forklifts only.
with four 30d nails.
1 each Cushioning material. Locate bottom
E
item F
portion under item F, the top portion
GENERAL INSTRUCTIONS
to extend 2 in. above item F (detail
2, fig 75).
1. Handbrakes are to be set and hand levers wired
4
Side block. Each to consist of one piece
F
or blocked in place.
of 2 x 6- x 36-in. lumber and three
pieces of 2 x 4 x 36-in. lumber
2. Gearshift levers must be placed and wire-tied
(detail 2, fig 75). Nail one edge of 2
in the neutral position.
x 6- x 36-in. piece to bottom 2 x
4 x 36in. piece with five 12d nails.
3. See General Rules 1, 2, 3, 4, 5, 9, 14, 15, 19A,
Then place against tire and nail to
19B, and 19C, section 1 of the Rules Governing the
car floor through 2- x 4- x 36-in.
Loading of Commodities on Open-Top Cars and
piece with four 20d nails. Nail other
Trailers, published by the Association of Ameri-
two 2 x 4 x 36in. pieces to one
can Railroads, for further details.
below in the same manner.
Wire rope. Each to consist of one piece
4
G
4. Tensioning of wire rope can be accomplished
5/8-in. wire rope, length as required
with an applicable sized come-along mechanical
(approximately 15 ft). Form a com-
hoist or equal tensioning device.
plete loop between tiedown shackle
77

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business