TM 55-3930-243-14
Table 72. Application of Materials for Blocking and
Table 72. Application of Materials for Blocking and
Tiedown of Forklifts on CONUS General-Purpose Flatcar
Tiedown of Forklifts on CONUS General-Purpose Flatcar
(Figs 7-1 thru 7-5)
(Figs 7-1 thru 7-5) -- Continued
No.
No.
Application
Application
required
required
Item
Item
or provision and appropriate stake
Brake wheel clearance. Minimum
A
pocket (detail 3, fig 7-5). Wire-rope
clearance required is 6 in. above, in
ends should overlap a minimum of 24
back of, and on both sides of, and 4 in.
underneath wheel.
in.
H
20
Clamps. Place four on each wire rope
8
Blocks (detail 1, fig 75). Locate one
B
at the overlap area, and space 3
against the front and rear of each
wheel.
inches apart with a minimum of 6
inches from ends of cable. Place one
16
Side cleat. Each to consist of one piece
C
clamp under each stake pocket and
of 2 x 4 x 20in. lumber. Locate
shackle to secure wire rope and thim-
one piece on each side of each item B.
ble together (detail 3, fig 7-5).
Secure to car floor with six 30d nails.
J
6
Thimbles. Place one at bottom of each
End cleat. Each to consist of two pieces
8
D
stake pocket (4) and each front shack-
of 2 x 4 x 12in. lumber. Locate
le, item K, where used.
one against end of each item B. Se-
K
2
Shackles. Attach one to each front tie-
cure lower piece to car floor with four
down provision, RTL10 and RTL10-
30d nails and top piece to lower piece
1 forklifts only.
with four 30d nails.
1 each Cushioning material. Locate bottom
E
item F
portion under item F, the top portion
GENERAL INSTRUCTIONS
to extend 2 in. above item F (detail
2, fig 75).
1. Handbrakes are to be set and hand levers wired
4
Side block. Each to consist of one piece
F
or blocked in place.
of 2 x 6- x 36-in. lumber and three
pieces of 2 x 4 x 36-in. lumber
2. Gearshift levers must be placed and wire-tied
(detail 2, fig 75). Nail one edge of 2
in the neutral position.
x 6- x 36-in. piece to bottom 2 x
4 x 36in. piece with five 12d nails.
3. See General Rules 1, 2, 3, 4, 5, 9, 14, 15, 19A,
Then place against tire and nail to
19B, and 19C, section 1 of the Rules Governing the
car floor through 2- x 4- x 36-in.
Loading of Commodities on Open-Top Cars and
piece with four 20d nails. Nail other
Trailers, published by the Association of Ameri-
two 2 x 4 x 36in. pieces to one
can Railroads, for further details.
below in the same manner.
Wire rope. Each to consist of one piece
4
G
4. Tensioning of wire rope can be accomplished
5/8-in. wire rope, length as required
with an applicable sized come-along mechanical
(approximately 15 ft). Form a com-
hoist or equal tensioning device.
plete loop between tiedown shackle
77
|