TM 55-3930-243-14
Table 5-3. Bill of Materials for Blocking and Tiedown of
Table 5-1. Bill of Materials for Blocking and Tiedown of
M10A Forklift on Semitrailer, M172A1 (Figs 5-3 and 54)
RTL10 or RTL101 Forklift on Semitrailer, M172A1 (Figs
Approximate
Item
Description
quantity
Approximate
Description
quantity
Item
Lumber
Douglas fir, or comparable, straight-
grain, free from material defects;
Douglas fir, or comparable, straight-
Lumber
Fed Spec MML751H:
grain, free from material defects;
2- x 4-inch
Fed Spec MM-L751H:
10 linear ft
10 linear ft
4- x 8-inch
2 x 4inch
9 linear ft
Nails
9 linear ft
Common, steel; bright; table XIb,
4 x 8-inch
Fed Spec FFN105B:
Common, steel; flathead; bright;
Nails
16d
40
table XIb, Fed Spec FFN105B:
20d
16d
40
8
40d
20d
8
40
60d
40
40d
16
16
Chain *
Load-lashing, -in. x 10-ft, with
60d
grabhooks; NSN 401000803
Load-lashing; -in. x 10-ft, with
Chain*
8858
grabhooks; NSN 4010-00803
10
Loadbinder* Double-hook, heavy-duty, 4in., ec-
8858
8
centric takeup with chain grab-
Loadbinder* Double-hook, heavy-duty, 4in., ec-
hooks, for - to -in. chain, with
centric takeup with chain grab-
two swivels; NSN 3990-00-274-
hooks, for to -in. chain, with
6746
2 swivels; NSN 3990-00-274-6746
8
10
Anchor, screw pin, 1inch pin size;
Shackles
*Items normally carried on semitrailer, M172A1, as basic
NSN 4030-00-542-3182
4
issue items.
*Items normally carried in semitrailer, M172A1, as basic
issue items.
Table 54. Application of Materials for Blocking and
Table 52. Application of Materials for Blocking and
Tiedown of M10A Forklift on Semitrailer, M172A (Figs 5-
Tiedown of RTL10 or RTL101 Forklift on Semitrailer,
3 and 54)
M172A1 (Figs 5-1 and 52)
No.
Item
required
Application
No.
Application
required
Item
Chock block (block detail, fig 5-2). Lo-
A
8
A
Chock block (block detail, fig 5-2). Lo-
8
cate 2- x 4-in. portion against wheels.
cate 2- x 4-in. portion against wheels.
Two blocks in front of each front
Two blocks in front of each wheel and
wheel and two blocks in rear of each
two blocks in rear of each wheel. Nail
rear wheel. Nail each block to semi-
each block to semitrailer with one
trailer deck with one 20d, two 60d,
20d, two 60d, and three 40d nails in
and three 40d nails in heel and one
heel and one 40d nail in each side of
40d nail in each side of block.
block.
B
10
Chain. Attach a chain from each front
4
Shackle. Attach one shackle to each
B
forklift lifting provision to trailer tie-
front tiedown and lifting provision.
down rings on trailer gooseneck. At-
Chain. Attach one chain to shackle on
C
8
tach a chain from each rear lifting
left front tiedown provision and to
provision and from each side tiedown
right front trailer tiedown ring. At-
provision to trailer tiedown rings.
tach one chain to shackle on right
Attach two chains from forklift tow-
front tiedown provision and to left
ing pintle to rear trailer tiedown
front trailer tiedown ring. Attach one
rings.
chain to shackle on left front lifting
10
C
Loadbinder. Attach one to each chain
provision and to left trailer goose-
(item B) and tighten.
neck tiedown ring. Repeat on right
side. Attach one chain to left rear tie-
down provision and to right rear
trailer tiedown ring. Attach one chain
to right rear tiedown provision and
to left rear trailer tiedown ring. At-
tach another chain to left rear tie-
down provision and to left side trailer
tiedown ring. Repeat on right side.
Loadbinder. Attach one to each item C
D
8
and tighten.
5-7
|