Page Title: Appendix A. DEMOUNTING AND REMOUNTING THE RT875CC SUPERSTRUCTURE
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 55-3810-306-15
APPENDIX A
DEMOUNTING AND REMOUNTING THE RT875CC SUPERSTRUCTURE
A-1. Demounting the RT875CC superstructure includes
and horizontal.  Remove the hook block and overhaul
removing forty 1-1/4-inch bolts, nuts and washers that
ball and rewind all rope on the hoist drums and stow the
secure the superstructure turntable swing bearing and ring
outrigger pads.
gear to the crane carrier deck plate. The crane swivel
2. With the superstructure rotated 4-1/2 to the
assembly must also be unbolted from the carrier and
right, from straight over front, four inner ring bearing bolts
suspended from and lifted off with the superstructure.
1, 2, 6, and 7 (figs 1 and 2) are visible through the
Disconnects for all fluid, air, and electric supply to the
elongated holes on each side of the turntable base plate.
superstructure are located at the lower end of the swivel
Mark these four bolts and do not remove them until all of
assembly, under the crane.
the following steps are completed.
3. Using crane power, the superstructure may now
CAUTION
be swung 18 to the right or left of the initial position in
Failure  to  demount  the  RT875CC
step 2 above, exposing pairs of unmarked bearing bolts
superstructure in the following step by
in the elongated holes on each side of the turntable base
step procedure could result in serious
plate. If the bolts on the left side, under the cab, can be
injury to personnel and/or damage to
reached with the available tool combination, begin by
the crane.
removing four bolts-3, 4, 8, and 9 or 34, 35, 39, and 40.
Continue incremental swings of 18in the same direction
A-2.  Tools needed to demount the superstructure are
and remove all bolts, except 1, 2, 6, and 7, previously
included in the standard variety, normally available in
marked. If bolts are tight in holes after nut removal, tap
heavy-equipment maintenance facilities.  Breaking the
out using a hammer.
1,965-foot-pound torque of the inner ring bearing bolts
4. Alternately,  if  a  multiplier-torque  wrench
may be accomplished with several different combinations
combination, air impact, or hydraulic wrench is to be
of tools, depending on availability:
used, and lacks vertical space on the left side under the
cab, all bolts may be removed through the elongated
1. A 28 to 1 multiplier plus a 30to 250-pound torque
holes on the right side of the turntable. Remove all bolts,
wrench, and 3/4-inch male to 1/2-inch female adapter.
except 1, 2, 6, and 7, in any sequence.
2. A 2,000-foot-pound torque wrench with handle
extensions as required.
CAUTION
When  swinging  boom  over  rear,
3. A 2,000-foot-pound-capacity impact wrench, if
shop air pressure is available.
during bearing bolt removal, raise the
boom  enough  to  clear  carrier
4. A 2,000-foot-pound hydraulic wrench, if auxiliary
structure so the operator can see to
hydraulic pressure is available. All of the above require a
the right side of the turntable.
1-7/8-inch socket with a compatible drive for the tool
selected. Also, a second 1-7/8-inch socket and handle,
open or box end wrench, is needed to hold the nut while
5. After all bolts except 1, 2, 6, and 7 are removed,
untorquing. Also, a socket set, up to 1-1/8-inch, is needed
swing the boom back to the initial, 4-1/2 to the right of
and material handling equipment and slings of at least
boom, straight over front position. (Bolts 1, 2, 6, and 7
53,000-pound-capacity to demount the superstructure and
are again exposed through the elongated holes in the
move the carrier.  If the crane is to be transported,
turntable base plate.) If the vertical height of the tool
semitrailers or railroad flatcars of this capacity must also
combination prohibits removing bolts 6 and 7 from under
be supplied.  Cribbing, planking, blocks, tiedown-chain
the cab on the left side of the turntable, break the torque
cables, straps, and so forth, must be onhand to stabilize
of these two bolts when the boom is to the right, straight
the removed superstructure on its transport vehicle or in
over rear position.  Leave 6 and 7 snug until final
its stowed location.
removal as stated in the steps below.
6. Suitable material handling equipment as noted
Demount Procedure:
above must be used to demount the superstructure.
Using a four-fall sling with single apex positioned above
1. Position the crane on a flat, level surface,
the superstructure longitudinal
outriggers retracted, boom over front, retracted
A-1