|
|
TM
55-2350-252-14
ATTACH TO ACCESS DOOR (2) AND LIFTING DEVICE. HAVE HELPER ASSIST.
a. Install two shackles (3, 4) in two lifting eyes on access door (2).
b. Install two non-adjustable legs of sling (1) to shackles (3, 4) on access door (2).
c. Install adjustable leg of sling (1) on lifting eye (5).
CAUTION:
WARNING!
NOTE:
Hydraulic parts can be
Power unit bolted
Screws are different
damaged when sup-
beam and access door
lengths. Note proper
porting bolted beam
can fall and injure you
location when remov-
if not removed prop-
assembly. Check that
ing screws. Some
parts clear trestles
erly. Be sure lifting
screws have multiple
before lowering bolted
device is attached
washers. Note num-
before screws are
beam assembly. DO
ber of washers with
NOT LOWER ON
removed.
screws.
FLOOR.
Figure D-4
3/4-inch bolts and remove half-moon Plates
bolts. Loosen male to female ends and remove
25. Troop seats. Remove pins and remove seats.
grenade launcher.
26. BII, Remove all BII and put in box.
24. Final drive half-moon plate Remove four each
D-4
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |