Click here to make tpub.com your Home Page

Page Title: Table 5-8. Application of Materials for Loading and Securing One M728 Combat Engineer Vehicle and One M60-Series Tank Facing ...
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 55-2220-058-14
Table 5-8. Application of Materials for Loading and Securing One M728 Combat Engineer Vehicle and
One M60-Series Tank Facing the Opposite Direction from that Shown in Figure 5-3
Item
No. Required
Application
A thru D
Channels. For description, refer to paragraph 2-2c.
E
10
Shackles.  At the rear of the M728 combat engineer vehicle, attach one shackle to each
tiedown fitting. At the front of the vehicle, attach one shackle to each bottom inside tiedown
fitting. At the rear of the M60-series tank, attach one shackle to each tiedown fitting. At the
front of the tank, attach one shackle to the top and bottom of each tiedown fitting.
F
2
Rings. Attach to towing pintles at rear of vehicles.
G
2
Wire ropes, 3/8-inch. Wrap gun tube of M60-series tank with cushioning material. Place
thimbles on two rear lifting eyes and apply wire rope in two complete loops: one around gun
tube to left-rear lifting eye, the other around gun tube to right-rear lifting eye. Pull loops hand
tight and secure ends with two 3/8-inch U-bolt clips. Secure each thimble to wire rope with
one 5/8-inch clip. (Not required if vehicle has operable external gun-tube brace.)
H
3
Lumber, 4x 6x 15-inch. Place one piece along centerline of flatcar and one piece 4 inches from
each outside edge of the flatcar, where the M728 combat engineer vehicle blade will rest.
I
48
Chains. Furnished with flatcar. Apply chains between vehicle tiedown fittings and anchor
locations on the deck of the flatcar, as described below.
J
2
Wire rope, 3/8-inch.  Wrap M728 boom with prot ective material.  Apply wire rope in two
complete loops, one around boom to left-front lifting eye, the other around boom to right-
front lifting eye. Pull loops hand tight and secure ends of each loop with three 3/8-inch U-
bolt clips.
K
as required
Cushioning material. Place cushioning material around tiedown chains at locations where
chains might rub against the M728 bulldozer blade.
M728 COMBAT ENGINEER VEHICLE
RT1
2
Chains. Attach chains to right-front tiedown shackle from chain anchors in C5 and A 5.
LT1
2
Chains. Attach chains to left-front tiedown shackle from chain anchors in B5 and D5.
RUSA
3
Chains. Attach two chains by looping chains around each top blade attachment point of RUSA
from chain anchors in B3 and A2. Attach one chain by looping chain around RUSA, aft of
structural crossmember, from chain anchor in B2.
RULS
1
Chain. Attach chain by looping chain around RULS from chain anchor in B1.
LUSA
3
Chains. Attach two chains by looping one chain around each top bulldozer-blade attachme nt
point of LUSA from chain anchors in D2 and C3. Attach one chain by looping chain around
LUSA, aft of structural cross-member, from chain anchor in B43.
LULS
1
Chain. Attach chain by looping chain around LULS from chain anchor in C1.
RT2
3
Chains. Attach chains to the right-rear tiedown shackle from chain anchors in A23-3/5, A25-2/
5, and A26-2/5.
LT2
3
Chains. Attach chains to the left-rear tiedown shackle from chain anchors in D23-3/5, D25-2/5,
and D26-2/5.
P
6
Chains. Attach chains to the ring in the pintle from chain anchors in B24, B25, B262/5, C24,
C25, and C26-2/5.
M60 TANK
RT1-B
3
Chains. Attach chains to the lower right-front tiedown shackle from chain anchors in A21, A20,
and C21.
LT1-B
3
Chains. Attach chains to the lower left-front tiedown shackle from chain anchors in D21, D20,
and B21.
RT1-T
3
Chains. Attach chains to the upper right-front tiedown shackle from chain anchors in B20,
B19, and A19.
LT1-T
3
Chains. Attach chains to upper left-front tiedown shackle from chain anch ors in C20, C19, and
D19.
RT2
3
Chains. Attach chains to the right-rear tiedown shackle from chain anchors in A41, A42, and
A43.
LT2
3
Chains. Attach chains to the left-rear tiedown shackle from chain anchors in D41, D42, and
D43.
P
6
Chains. Attach chains to the ring in the pintle from chain anchors in B41, B42, B43, C41, C42,
and C43.
5-14

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business