|
|
TM 55-1930-208-24
d. Column 4, Maintenance Category. Column 4 specifies, by the listing of a work time figure in the appropriate
subcolumn(s), the category of maintenance authorized to perform the function listed in Column 3. This figure represents
the active time required to perform that maintenance function at the indicated category of maintenance. If the number or
complexity of the tasks within the listed maintenance function vary at different maintenance categories, appropriate work
time figures will be shown for each category. The work tine figure represents the average time required to restore an
item (assembly, subassembly, component, module, end item, or system) to a serviceable condition under typical field
operating conditions. This time includes preparation time (including any necessary disassembly/assembly time),
troubleshooting/fault location time, and quality assurance/quality control time in addition to the time required to perform
the specific tasks identified for the maintenance functions authorized in the maintenance allocation chart. The symbol
designations for the various maintenance categories are as follows:
C ...................... Operator or crew
O...................... Organizational maintenance
F ...................... Direct Support Maintenance
H ...................... General Support Maintenance
D ...................... Depot Maintenance
e. Column 5, Tools and Equipment. Column 5 specifies, by code, those common tool sets (not individual tools) and
special tools, TMDE, and support equipment required to perform the designated function.
f. Column 6, Remarks. This column shall, when applicable, contain a letter code, in alphabetic order, which shall
be keyed to the remarks contained in Section IV.
B-4.
EXPLANATION OF COLUMNS IN TOOL AND TEST EQUIPMENT REQUIREMENTS, SECTION III.
a. Column 1, Reference Code. The tool and test equipment reference code correlates with a code used in the
MAC, Section II, Column 5.
b. Column 2, Maintenance Category. The lowest category of maintenance authorized to use the tool or test
equipment.
c. Column 3, Nomenclature. Name or identification of the tool or test equipment.
5
This maintenance category is not included in Section II, column (4) of the Maintenance Allocation Chart. To
identify functions to this category of maintenance, enter a work time figure in the "H" column of Section II,
column (4), and use an associated reference code in the Remarks column (6). Key the code to Section IV,
Remarks, and explain the SRA complete repair application there. The explanatory remark(s) shall reference the
specific Repair Parts and Special Tool List (RPSTL) TM which contains additional SRA criteria and the additional
spare/repair parts.
B-3
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |