TM 55-1930-208-24
4-9. WINCH, ANCHOR.
This task covers:
a.
Removal
b. Disassembly
c. Cleaning
d. Inspection
e.
Repair
f. Reassembly
g. Installation
INITIAL SET-UP:
Tools Required:
Tool Kit, General Mechanics (Item 1, Appendix B)
Materials Required:
Pin, Cotter P/N 7900-61
Solvent, Cleaning (Item 4, Appendix C)
Equipment Conditions:
Barge is moored (paragraph 2-7, TM 55-1930-208-10).
a. Removal. (Refer to figure 4-4).
(1) Attach a sling to drum of winch. Attach a suitable lifting device to sling.
(2) Remove ten nuts (1), ten bolts (2), and two deck brackets (3). Raise lifting device and remove winch.
b. Disassembly.
(1) Refer to figure 4-4 and remove setscrew (4) from handwheel. Remove two cotter pins (5), pin (6), block (7),
shoe (8), pedal (9), strut (10), and shaft (11).
(2) Remove handwheel (12) and key (13). Remove pin (14), knob (15), and washer (16).
(3) Remove two bolts (17), shaft (18), and gear (19). Press bearing (20) out of gear (19). Remove grease fitting
(21).
(4) Install blocking under drum and remove drum shaft (22) by driving out with a rod and maul. Remove wedge
(23) and drum (24). Press bearing (25) out of drum (24).
(5) Remove lever extender (26), two bolts (27), and two brackets (28). Remove four nuts (29), two studs (30),
two tubes (31), cover (32), and two shafts (33).
(6) Remove bolt (34), stop (35), frame (36), shaft (37), washer (38), gusset (39), and frame (40). Press bearings
(41) from each frame.
(7) Remove pin (42) from frame. Remove wheel (43) and key (44).