Click here to make tpub.com your Home Page

Page Title: Section II. MAINTENANCE OF HULL
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 55-1930-208-24
Section II. MAINTENANCE OF HULL
4-4. HULL.
This task covers:
a. Repair
INITIAL SET-UP:
Equipment Conditions:
Engine shut down (paragraph 2-11, TM 55-1930-208-10).
a. Repair.
WARNING
Do not weld at any location on this barge until a safe area has been determined
which is gas and fume free. Failure to comply with this warning could result in
injury to personnel.
(1) Repair of the hull is limited to welding and painting.
(2) Refer to TM 9-237 for welding and TM 55-503 for hull repair.
(3) Refer to TM 43-0139 for painting.
WARNING
Do not weld a closed fuel tank or container until every precaution has been
taken to eliminate all confined gases and fumes from inside and outside the tank
or container area. Failure to comply with this warning could result in injury to
personnel.
4-2

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business