|
|
TM 55-1915-200-10
2-5.31. Handling Davit Operation.
WARNING
c. Pull release lanyard (3) (to arm davit hook for
automatic release) when raft is close to or on the water.
Clear working area of unnecessary
personnel and equipment prior to davit
NOTE
operations.
If davit hook fails to release when the raft is
Safe Pre-Operation Set-Up requires three
floating, firmly pull release lanyard to override
persons to elevate boom and a fourth
the davit hook release mechanism.
person to install boom support pin. Failure
to follow set-up procedures could result in
2-5.30.5. Retrieving Davit Hook.
serious injury and damage to equipment.
NOTE
2-5.31.1. Pre-Operation Set-Up and Control Check
.
Prior to launching additional rafts, the davit
Inspect work area around davit to ensure safe operating
operator must reset the brake and retrieve the
area. One winch operator and three assistants complete
pre-operation set-up and control check as follows:
davit hook. The operator must then shift raft
container to the deployment position, attach lift
ring, inflate, and load second or additional rafts.
a. Remove access cover (1, FIGURE 2-200) on
storage compartment (2) and remove remote winch
control (12) and power cord (8).
a. Raise davit manual brake release lever (7,
WARNING
b. Place BRAKE RESET LEVER (2) to SET
Never plug power cord in to an ungrounded
position.
outlet.
c. Insert winch handle (1) on HIGH SPEED
RETURN shaft of liferaft davit (3).
Prior to connecting electrical power, ensure
that electric remote control is in OFF
d. Crank winch handle (1) (raise davit hook) until
position.
Otherwise the winch could
an adequate length of cable remains to reach the
unexpectedly start, causing serious
container deployment chain (1, FIGURE 2-197).
personal injury or damaging equipment.
e. Retrieve davit hook using the retrieval line (1,
b. Turn on electrical power at starboard lighting
f. Remove winch handle from HIGH SPEED
distribution panel L-3 (19, FIGURE 2-101, Sheet 5 of 21)
RETURN shaft (3, FIGURE 2-198).
located in the starboard passageway on Main Deck.
NOTE
Refer to paragraph 2-5.30.1 to deploy container
and lower and detach raft.
2-528
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |