Click here to make tpub.com your Home Page

Page Title: Liferafts and Davit.
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 55-1915-200-10
k. Pull attached release lanyard (3) to open davit
b. Push the START/STOP button (2, FIGURE 2-
hook (5).
196).
l. Place jaws of davit hook (5) over container
c. Push the START/STOP button (2, FIGURE 2-
deployment chain ring (1) and squeeze hook (5) shut.
196) to stop the ventilator.
m. Crank winch handle (1, FIGURE 2-198) (raise
2-5.30. Liferafts and Davit.
davit hook) until raft container is rolled out to the
deployed position.
2-5.30.1. Shifting Davit and Raft Container to
n. Install two containment pins (6, FIGURE 2-197)
Deployment Position.
on each side of raft container.
o. Crank winch handle (1, FIGURE 2-198) (lower
a. Disconnect safety chain from hand rail at raft
davit hook) until an adequate length cable is payed out
boarding area.
to reach raft lifting ring located under the velcro boot (8,
FIGURE 2-197) on the raft container.
b. Insert hairpin (3, FIGURE 2-197) in pin retainer
(2) on side of raft container and remove two
p. Retrieve davit hook (5, FIGURE 2-199) using
containment pins (6) from each side of raft container.
the retrieval line (1).
c. Insert winch handle (1, FIGURE 2-198) on LOW
q. Pull release lanyard (3) to open davit hook (5)
SPEED RETURN shaft of liferaft davit (4).
and remove container deployment chain ring (1,
FIGURE 2-197) from davit hook (5, FIGURE 2-199).
d. Raise davit hook (5, FIGURE 2-199) by
cranking the winch handle until tension on davit boom
2-5.30.2. Deployment and Inflation of Liferaft.
tieback (9, FIGURE 2-198) is released.
a. Pull raft lifting ring out of velcro boot (8,
e. Remove davit boom tieback (9).
FIGURE 2-197) approximately 6 inches.
f. Remove winch handle (1) from low speed return
b. Place jaws of davit hook (5, FIGURE 2-199)
shaft (4) of liferaft davit.
over raft lifting ring and squeeze hook shut.
g. Release brake on liferaft davit by lifting manual
c. Remove winch handle (1, FIGURE 2-198) from
brake release lever (7, FIGURE 2-198). Davit should
LOW SPEED RETURN shaft (4).
travel to full outboard position.
d. Lower manual brake release lever (7, FIGURE
h. Insert winch handle (1) on LOW SPEED
2-198) to set manual brake.
RETURN shaft (4) of liferaft davit.
i. Crank winch handle (1) until an adequate length
is payed out, allowing davit hook (5, FIGURE 2-199) to
reach the container deployment chain (1, FIGURE 2-
202) located on the inboard sloping side of the raft
container.
j. Retrieve davit hook (5, FIGURE 2-199) using
the retrieval line (1).
2-523

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business