TM 55-1915-200-10
CAUTION
f. Disengage auxiliary spool clutch (16, Sheet 3 of
Never  release  brakes  completely.
4).
Maintain "drag" on brakes to prevent
g. Check hydraulic fluid level (7, Sheet 1 of 4).
runaway  of  spool  which  could
h. Stop hydraulic pump as follows:
damage winch.
(1) Depress STOP button (4, Sheet 1 of 4).
e. Haul in wire rope by moving control valve (13,
(2) Turn off circuit breaker No. 2 (FIGURE 2-
Sheet 2 of 4) UP.
101, Sheet 17 of 21) on power panel P3 in Emergency
f. Hold control valve (13, Sheet 2 of 4) UP until
Generator Room, main deck aft.
anchor is up and against anchor rack.
2-5.18.2.
Stern Ramp Winch and Stern Ramp
g. Engage brake (11, Sheet 2 of 4).
Operation.
CAUTION
WARNING
Never engage dog while spool is
Before operating winch, be
moving. Engaging dog while spool
sure personnel and foreign
is moving will destroy winch.
objects are clear of stern
h. Engage main spool dog (14, Sheet 2 of 4).
ramp, winch, fairleads, wire
ropes
and
related
i. Secure anchor to vessel by inserting anchor
components.  Moving ramp
holdback wire (24, Sheet 4 of 4) through anchor shackle
(22, Sheet 4 of 4) and attaching holdback wire to pad
and winch parts can cause
eyes (23, Sheet 4 of 4).
serious injury or death.
Never leave controls while
j. Conduct post-operation check of controls as
ramp is moving or ramp winch is
prescribed in paragraph 2-5.18.1.5.
running.
2-5.18.1.5. Post-Operation Check of Controls. Perform
Never perform maintenance
the following checks after operating the stern anchor
winch.
while ramp winch is running.
a. Conduct a complete inspection of winch and
a. Perform Pre-Operation Check of controls.
components.
(1) Inspect  winch  and  bow  ramp
b. Engage brakes (11, FIGURE 2-164, Sheet 2 of
components.
4).
(2) Move manual control valve (8,
c. Engage main spool dog (14, Sheet 2 of 4).
FIGURE 2-162, Sheet 2 of 2) to NEUTRAL.
d. Disengage clutch (Sheet 3 of 4).
(3) Check hydraulic fluid level (7, Sheet
1 of 2).
e. Engage auxiliary spool dog (17, Sheet 3 of4).
2-466