|
|
TM 55-1915-200-10
b. Turn gypsy clutch handwheel (8, Sheet 2 of
c. Engage port and starboard clutches (27,
Sheet 2 of 4).
4) counterclockwise to disengage gypsy clutch (27,
Sheet 2 of 4).
d. Engage port and starboard chain stoppers
(32, Sheet 3 of 4).
c. Hold control valve (28, Sheet 3 of 4) up to
e. Engage port and starboard windlass brakes
rotate gypsy counterclockwise or down to rotate gypsy
(10, Sheet 2 of 4).
clockwise.
f. Depress hydraulic pump STOP button (5,
d. Engage clutch (27, Sheet 2 of 4), by turning
Sheet 1 of 4).
gypsy clutch handwheel (8, Sheet 2 of 4) clockwise,
when gypsy operations are complete.
g. Open circuit breaker No. 1 (FIGURE 2-101,
Sheet 15 of 21) in power panel P1 on port bulkhead of
bow ramp hydraulic machinery room.
NOTE
2-5.17.2. Bow Ramp Winch and Bow Ramp Operation.
When additional pulling power is
needed for hauling in lines, such as
2-5.17.2.1.
Pre-Operational
Check
of
Controls.
during
mooring
or
docking
operations,
gypsies
may
be
disconnected
and
operated
a. Place bow ramp winch control valve (16,
independently of wildcats.
Sheet 2 of 4), located on port winch assembly, in the
center (neutral) position.
2-5.17.1.6. Post-Operation Check of Controls.
b. Disconnect port and starboard clutches (12,
a. Conduct a thorough visual inspection of both
Sheet 2 of 4) from bow anchor windlass assemblies.
port and starboard bow anchor windlass assemblies
including clutches, brakes, wildcats, gypsies, visible
c. Engage port and starboard clutches (20,
anchor chain and hydraulic unit in machinery room.
Sheet 2 of 4).
Check all hydraulic lines, fittings and gauges for leaks.
Report noted deficiencies to unit maintenance.
d. Engage port and starboard bow ramp winch
handbrakes (14, Sheet 2 of 4).
b. Disconnect port and starboard clutches (12)
from bow ramp winch drum (13, Sheet 2 of 4).
e. Engage hydraulic pump circuit breaker No. 2
machinery room).
2-453
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |