Click here to make tpub.com your Home Page

Page Title: Starboard Main Engine.
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 55-1915-200-10
(5) Close valves 6, 43, and 51.
(2) Open pump suction valves (2 and 9).
(6) Set  MAIN  ENGINE  PRE-LUBE  OIL
PUMP-STBD circuit breaker (78, FIGURE 2-103, Sheet
(3) Open pump discharge valves (8 and 16).
5 of 7) on Engine Room Motor Control Center to the ON
(4) Open inline stop valves (13 and 17).
position.
(5) Set STBD HAND-OFF-AUTO switch (1,
(7) Press MAIN ENGINE PRELUBE OIL
Figure 2-91) to HAND position.
PUMP STBD start button (101).
(8) Press start button (1, Figure 2-129)
NOTE
starboard station.
Located on the port stanchion is the
motor controller for the port stern
NOTE
tube lubricating pump.  This pump
Prelubricate engine at a minimum of
will be used as backup.
10 psi (69 kPa) for a period of not
less than 3 and not more than 5
(6) Set port stern tube lubricating pump in
minutes.
AUTO position (1).
d. Align STBD Main Engine lube oil circulating
f. Align fuel oil service piping (FIGURE 2-130) to
system (FIGURE 2-127) as follows:
the starboard main engine as follows: (1) Open fuel oil
(1) Open STBD Main Engine lube oil filter
day tank outlet valve (2).
inlet valve (14).
(2) Open inline stop valve (23).
(2) Open STBD Main Engine lube oil filter
(3) Open STBD engine inline stop valve (9).
outlet valve (16).
(4) Open one STBD engine fuel oil strainer
e. Align starboard main engine lube oil
inlet valve (12).
transfer and purification piping system (FIGURE 2-128)
as follows:
NOTE
(1) Close all valves in lube oil transfer and
Place one fuel oil strainer in use and
purification piping system.
keep the other strainer as backup.
(2) Open STBD prelube pump suction valve
(11).
(5) Open the same fuel oil strainer outlet
(3) Open STBD prelube pump discharge
valve (8).
valve (22) to main engine.
(6) Open two Racor fuel oil filter inlet valves
(4) Open discharge valve (19) to STBD main
(20).
engine lubricating system.
2-376

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business