room on the right side of door and the inside chill room
2-5.4.4.2. Operation. (FIGURE 2-116)
on the left side of freeze room door.
h. Check that system cycles at proper temperature
a. Turn freeze room thermostat (12, Sheet 4 of 4)
settings by monitoring unit cooler fans when cycling on
to -100F setting.
and checking thermometer settings at unit cooler fan
b. Turn chill room thermostat (12) to 36-380F
when turning off.
setting.
2-5.4.4.3. Operation After First 24 Hours. (FIGURE 2-
NOTE
116)
Outboard compressor and control
box above it is for freeze room, and
a. Check compressors (3 and 5, Sheet 1 of 4) for
inboard compressor and control box
knocking, cavitation, and unusual noises.
is for chill room.
b. Check thermometers outside chill room door
and inside chill room on left side of freeze room door for
c. Set circuit breaker (3, FIGURE 2-101, Sheet 16
proper temperature settings.
Chill room, 36-38 ;
F
of 21) on power panel P2 in upper machinery room to
freeze room, -10 .
F
ON (up) (freeze room) and circuit breaker 4 to ON (chill
c. Check thermostats (12, FIGURE 2-116, Sheet 3
room).
of 4) under each room unit cooler for proper setting.
d. Set power switches located on upper left side of
d. Check each unit cooler coil behind cooler fan
compressor control boxes (1 and 2, FIGURE 2-116,
(11) for excessive ice buildup.
Sheet 1 of 4) to ON (up).
e. Observe unit cooler fans (11) to determine if
each is operating freely.
CAUTION
f. Check drain pans in each unit cooler for
After refrigeration unit startup, if
excessive amount of water.
grinding  noises  are  heard  from
compressors or motors or leaks
g. On poop deck aft, observe each condenser fan
observed in piping, shut power off
(9) for free rotation.
on control boxes (1 and 2) by setting
power  switches  to  off  (down)
NOTE
immediately.
Refer
to
unit
If any problems or defects resulting
maintenance.
from these checks are observed,
refer to unit maintenance.
e. Turn door seal heater control (14, FIGURE 2-
2-5.4.4.4. Shutdown. (FIGURE 2-116)
116, Sheet 4 of 4) to 1400F.
f. Check  liquid  refrigerant  sight  glasses  (4,
a. Check that thermostats (12, Sheet 3 of 4) in chill
FIGURE  2-116,  Sheet  1  of  4)  located  behind
room and freeze room are set to proper temperature
condensers (3 and 5). If bubbles appear, refrigerant is
settings. Chill room, 36-38 ; freeze room, -10 .
F
F
low. Refer to unit maintenance.
g. Monitor system temperatures on the monitor
thermometers (13, Sheet 3 of 4) located outside the chill
2-356