Click here to make tpub.com your Home Page

Page Title: PREPARATION FOR USE.
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 55-1915-200-10
Section III. OPERATION UNDER USUAL CONDITIONS - Continued
2-3.
GENERAL.
The  following  information  is
NOTE
provided for the guidance of personnel responsible for
Circuit breakers for equipment vital
operation of the LSV. It is essential that operator/crew
to LSV operation are located on the
know how to perform every operation of which the
emergency switchboard bus.  They
equipment is capable and for coordinating the basic
are electrically powered from the
motions to perform the specific tasks for which the LSV
main switchboard through circuit
was designed.  Since nearly every job presents a
breaker/motor operator (14, FIGURE
different problem, the operator may have to vary given
2-102, Sheet 2 of 2). These systems
procedures to fit the individual job.
operate on normal ship power and/or
emergency power.
2-4.
PREPARATION FOR USE.
2-5.
OPERATING PROCEDURE.
The following
a. On Main Switchboard (FIGURE 21 02), set all
operating procedures are sequential to allow the vessel
circuit breakers to the OFF position.
master to bring the LSV from a dead in the water mode
b. On  Engine  Room  Motor  Control  Center
to a full power underway condition.
(FIGURE 2-103), set 150 amp bus tie circuit breaker
(46, Sheet 3 of 7) to ON position.
Instructions are provided to systematically bring each
subsystem/equipment
into
operation.
Each
subsystem/equipment
will
have
the
before
NOTE
Operator/Crew preventive maintenance checks and
The 150 amp bus tie circuit breaker
services (PMCS) performed as it is prepared for
(46) connects the main switchboard
operation. See Table 2-2 in Section II of this chapter.
bus to the emergency switchboard
bus for items on the emergency
2-5.1. Power Generation.
switchboard.
a. On Main Switchboard, set MAN/OFF/AUTO
c. Set all other circuit breakers on Engine Room
switch (29, FIGURE 2-102, Sheet 1 of 7) to the AUTO
Motor Control Center (FIGURE 2-103, Sheets 1 through
position.
7) to OFF position.
b. Align Ship's Service Diesel Generator fuel oil
d. On Emergency Generator Control Panel (in
service piping system (FIGURE 2-104) to the electric
emergency generator room, main deck), set engine
start port generator as follows:
control switch (15, FIGURE 2-20) to the RESET/OFF
position.
(1) Close all fuel oil manifold valves in fuel oil
e. On Emergency Switchboard (FIGURE 2-21) set
service piping system.
all circuit breakers to ON position.
(2) Open fuel oil header inlet valve (2).
(3) Open in-line STOP valve (25).