Click here to make tpub.com your Home Page

Page Title: Table 2-2. Operator/Crew Preventative Maintenance Checks and Services (cont)
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 55-1915-200-10
B
Table 2-2. Operator/Crew Preventative Maintenance Checks and Services
EQUIPMENT NOT READY/AVAILABLE
- BEFORE D - DURING A - AFTER W - WEEKLY M - MONTHLY Q - QUARTERLY S/A SEMI ANNUALLY AN - ANNUALLY
IF
T/A - TRIENNIALLY
ITEM
B
D
AWM
Q S/A AN T/A
ITEMS TO BE INSPECTED
CHECK FOR
ACTION
PMC
NMC
NUMBER
X
X
XX
Hydraulic Lines
Check hydraulic lines, fittings and control valves
Repair leaks as necessary. Class III leaks.
for leaks.
NOTE
Refer dripping oil and hydraulic leaks to
supervisor.
X
X
X
Hydraulic Fluid Tank
Check fluid level, filter condition and hydraulic
Add fluid, change filter.
Fluid is low, filter
pressure.
condition
indicator in red
or if hydraulic
pressure
exceeds 2000
PSI.
X
Visually check condition of cable (reeled position). Repair or replace as
70
Shore Power Cable/Reel
Check for cracked or damaged insulation.
necessary.
Assembly
X
X
Check condition of cable connection. Ensure
Remove corrosion and
connector is protected from moisture, dirt buildup preserve connector as
and corrosion.
necessary.
X
Visually check reel assembly for damage and
Remove corrosion, repair
corrosion.
damage.
NOTE
Defer PMCS when shore power operation is in
progress.
X
Check that gear train is unobstructed.
Remove obstructions.
X
X
Visually check terminal box (exterior) for damage Clean, repair as necessary.
71
Shore Terminal Box
(on
and corrosion. Ensure box is securely fastened.
vessel)
Refer to supervisor, unit
Proper and safe
X
X
X
Inspect entire ramp and related components
72
Bow Ramp
maintenance for repair.
operation is not
including wire rope, ramp hinges, sheave
assemblies, locking bars, and ratchet dogs for
possible. LO/LO
operations only.
proper adjustments, damage, or excessive wear.
LSV PMCS
Change 12
2-284

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business