|
|
TM 55-1905-223-24-7
t.
Connect nonmetallic hose (2) with hose clamp to cleaning valve assembly and secure with hose clamp.
u. Connect nonmetallic hose (24) with hose clamp on brine flowmeter assembly and secure with hose clamp.
v.
Connect salinity probe (11) wiring to water quality monitor terminals 4 and 5. Remove tags.
w. Open appropriate inlet feedwater gate valve (2, FIGURE 3-3 Sheet 1).
x.
Startup watermaker. Refer to TM 55-1905-223-10.
y.
Observe brine manifold assembly for leaks. Repair as necessary.
z.
Remove "Out of Service Do Not Operate" tag.
3-18
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |