|
|
![]() TM 55-1905-223-24-7
2-24. Replace/Repair Product Flowmeter Assembly. (FIGURE 2-25)
This task covers: a. Removal, b. Repair, c. Replacement.
INITIAL SETUP
Tools
Equipment Condition
Tool kit, general mechanic's,
RO desalinator shut down.
Refer to TM 55-1905-223-10.
Plastic dash panel removed.
Refer to paragraph 2-22.
Materials/Parts
Product flowmeter assembly removed.
Refer to paragraph 2-22.
Product flowmeter assembly
P/N 7388
Nonmetallic hose P/N PVTBF025
REMOVAL
a. Remove two hose clamps (4, 8).
b. Remove nonmetallic hoses (3, 7).
c.
Remove product flowmeter assembly (2) from dash.
d. Remove elbow hose adapters (5, 1) from flowmeters.
REPAIR
a. Inspect nonmetallic hoses (3, 7) for cracks and swelling.
b. Discard damaged hoses.
REPLACEMENT
a. Install elbow hose adapters (5, 1) to flowmeter.
b
Install flowmeter assembly (2) into dash panel.
c.
Install nonmetallic hoses (3, 7); secure with hose clamps (4, 8).
d. Replace product flowmeter assembly. Refer to paragraph 2-22.
2-82
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |