|
|
TM 55-1905-223-24-4
Table 2-1. Preventive Maintenance Checks and Services (PMCS)-CONT
E - Every 20 hours
W - Weekly
Q - Quarterly
S - Semiannually
A - Annually
B - Biennially
ITEM
INTERVAL
ITEMS TO BE
Procedures
NO.
INSPECTED/SERVICED
EWQ
S
A
B
4
Generator set -
NOTE
CONT
CONT
Operator should remain in attendance.
Emergency Generator/Switchboard start Procedure.
NOTE:
This procedure provides a means to test automatic starting of
Emergency Generator and allows the exercise of the Emergency
Generator without disturbing the main switchboard.
a. Place the Emergency Generator Run-Oft-Auto switch to
Auto, and the Emergency Stop PB switch is pulled out.
5.
Battery
b. Place the Emergency Switchboard Mode Switch to Test.
This will open P0201 (Main S.B. Bus Tie brkr), while also starting
the Emergency Generator and energizing the Emergency
Switchboard.
Emergency Generator/Switchboard Shutdown Procedures
NOTE:
a. Place Emergency Switchboard MODE Switch to Man position.
b. Place the Emergency Generator Circuit Breaker Switch to
momentary TRIP position. The Emergency Generator Circuit
Breaker will open and the Emergency Generator will stop.
c. Close Main Switchboard Bus Tie Circuit Breaker PO201).
(
The Emergency Switchboard is now energized by the Main
Switchboard.
Change 1
2-5
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |