|
|
TM 55-1905-223-24-17
4-14.
Repair Air Conditioner Assembly ( Air Conditioner 2; Accommodations)
This task covers:
a. Adjustment
b.
Repair
INITIAL SETUP :
Tools
Equipment Condition
Tool kit, general mechanic's
Except for cooling thermostat
replacement, system pumped
Tool kit, electrician's
down and all tubing, lines, and
compressor purged residual
Tool kit, refrigeration and
refrigerant charge (Item 10, Table
air conditioning
4-1).
Electrical power OFF and circuit
Torque wrench
tagged "Out of Service."
5120-01-092-3278
Materials/Parts
Electrical tag, Item 1, Appendix C
Pressure switch P/N P28DA-1
Cooling thermostat P/N A19ABC-74
Hot gas valve P/N A9SE
Liquid line valve P/N ME25S270
Refrigeration ball valve P/N 592A-13ST
Refrigeration ball valve P/N 587A-14ST
Angle valve P/N 600A-4B
Pressure relief valve P/N 3014
Moisture indicator P/N 60-14S
R-22 refrigerant, Item 7, Appendix C
ADJUSTMENT
a.
Adjust the oil pressure switch as follows:
(1) The proper oil pressure cutout setting is 10 psi net oil pressure on the oil pressure switch (FIGURE
setting. If the pointer (9) is not set (or pointing to) 10 psi on the setting indicator (10), the switch
must be adjusted.
4-28
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |