Click here to make tpub.com your Home Page

Page Title: Repair Fan, Ventilating (Supply Fan #4) (Bowthruster Room). (F IGURE 2-15)
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 55-1905-223-24-17
2-25. Repair Fan, Ventilating (Supply Fan #4) (Bowthruster Room). (F IGURE 2-15)
This task covers:
a. Adjustment
b. Removal
c. Repair
d. Replacement
INITIAL SETUP :
Tools
Equipment Condition
Tool kit, general mechanic's,
Circuit breaker switch OFF, power
panel locked and tagged "Out of
Tool kit, electrician's,
Service - Do Not Operate."
Puller, 5120-00-516-3120
See TM 55-1905-223-10 for HVAC
systems operation and equipment
Materials/Parts
location.
Ventilating fan P/N 716800-01
Machine key P/N 100500-01
V-belt P/N 725537-39
WARNING
Make sure electrical power is OFF to avoid personal injury.
ADJUSTMENT
a. Adjust and align fan and motor pulleys.
(1)
Remove bolts (12, two on each side) an remove weather cover (1) for access to belt and motor.
(2)
Visually check pulley alignment before adjusting V-belt. Loosen bolts, nuts and lockwashers (8) to
relieve tension on belt.
(a)
Make sure motor pulley (3) is aligned properly with fan pulley (11).
(b)
To align pulleys, loosen the four bolts, nuts, and washers (6) holding the motor (5) to the base
plate (7) and adjust the motor as required.
(c)
When pulleys are aligned, secure bolts, nuts, and washers (6) firmly.
2-67

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business