Click here to make tpub.com your Home Page

Page Title: Shutdown.
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 55-1905-223-24-17
8
Operating suction (low side) and discharge (high side) pressures have to be checked with
portable manifold gauges. Check these pressures only when required as a troubleshooting
function.
(c)
Shutdown.
1
Set thermostat to OFF.
2
Turn primary circuit breaker to the air conditioner OFF. Tag the circuit breaker if it is being
secured for maintenance functions.
(2)
16-ton unit (Accommodations, A/C-2).
CAUTION
If the Accommodation Unit's (A/C-2) main power breaker, or disconnect switch, has
been turned OFF for over 4 hours, the unit's HEAT/OFF/COOL manual switch on
thermostat must remain OFF for a period of 5 hours after turning main power
breaker, or disconnect, ON. This energizes the compressor crankcase heater and
allows the oil time to re-heat.
(a)
Pre-inspection and service.
1
Check air filters to make sure they are clean and properly in place. Correct or replace
filters as required (paragraph 2-33).
2
Clean all supply and return air grilles of dust and debris.
WARNING
Turn electrical power OFF to avoid personal injury.
3
Check electrical connections for loose. Secure as required.
4
Check V-belt on blower for looseness and proper alignment. Secure or align as required
5
Make sure external seawater strainer is clean (TM 55-1905-223-24-18).
6
Make sure seawater inlet and outlet valves are open.
7
Make sure discharge and suction service valves are open.
2-7

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business