|
|
![]() TM 55-1740-203-13&P
Operator Preventive Maintenance
Checks
and
Service8
-
Table
2-1.
continued
Equipment Is
Procedures
Not Ready/
Check for and have repaired
I t e m to be
I n erval
Item
A v a i l a b l e If:
or adjusted as necessary
Inspected
No.
D
A
B
R e a r Frame
Assembly
Check that coupling hard-
Suspension
16
ware (1) and jack handle
Frame
( 2 ) are stowed in quick
clamps (3).
Lockout
Check that lower struts
Lockout
17
struts dam-
straight pins (4) are se-
Struts
a g e d or mis-
curely installed. Check
sing.
that upper strut locking
p i n s (5) are installed in
tee pins (6). Inspect
rear lockout struts (7)
for damage.
R I G H T REAR LOCKOUT STRUT
L E F T REAR IS
SHOWN.
SIMILAR.
2-8
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |