Click here to make tpub.com your Home Page

Page Title: Section III. REPAIR PROCEDURES
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 55-1740-202-13&P
Section III. REPAIR PROCEDURES
4-6. REMOVAL AND DISASSEMBLY. Before overhaul procedures can start, the transporter must be prepared for
maintenance as specified in paragraph 4-1. To disassemble the transporter, proceed as follows:
a. Wheel, Tire, and Tube Assembly.
(1) Loosen but do not remove cone nuts (1, fig. 4-1).
(2) Raise wheel to be removed off ground, using a suitable jacking method.
(3) Remove six nuts securing wheel (7) to wheel hub. Remove wheel.
(4) If necessary, remove tire (2), tube (3), and flap (6) from wheel (7).
b. Hub.
(1) Remove grease cap (1, fig. 4-2).
(2) Remove cotter pin (2) and unscrew spindle nut (3). Remove key washer (4) and outer bearing assembly (5
and 6). If necessary, remove snap ring (7).
(3) Remove hub (8).
(4) If necessary, remove Z-ring (14), and O-ring (13), grease seal (10), and inner bearing assembly (11 and
12).
c. Hub and Drum.
(1) Remove grease cap (1, fig. 4-3).
(2) Remove cotter pin (2) and unscrew spindle nut (3). Remove key washer (4) and outer bearing assembly (5
and 6). If necessary, remove snap ring (7).
(3) Slowly remove hub and drum (8).
(4) If necessary, remove Z-ring (14), O-ring (13), grease seal (10), and inner bearing assembly (11 and 12).
4-4

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business