|
|
TM 55-1740-202-13&P
c. Pump each jack until the jack piston exerts a lifting pressure on the transporter assembly. When each jack has
reached this point, the shelter is ready for lifting.
d. Station a man at each jack and raise the shelter by pumping the jacks in unison.
e. Extend the jacks until the strut lockouts can be pivoted into position without striking the shelter or container.
Continue extending the jacks until the T-pins can secure the lockout struts in their top brackets. Secure the T-pins with
cotter hairpins.
f. Apply the hand brake.
g. Using extreme caution, attach the safety cable to the rear transporter assembly and tighten turnbuckle.
h. Remove and stow extension jack handles on the front and rear suspension frames.
i. Attach the tow vehicle to the transporter (paragraph 2-2, steps c, d, and e). The transporter is now ready for
towing.
2-4
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |