|
|
TM 55-1730-228-13&P
4-27. PLATFORM - REPLACE
4-27
This task covers:
a. Removal
b. Installation
INITIAL SETUP
Special Tools/Test Equipment
Overhead Hoist, Slings and Chains
Equipment
Condition
Para
Condition Description
3-42
Guardrails removed
2-13
Platform section
removed.
4-26
Deck Extensions removed.
4-25
Extension Ladder removed.
4-7
Platform control box
removed.
3-23
Platform lights removed.
3-22
Platform limit switches
removed.
Materials/Parts
GAA Grease (Item 5, Appendix D)
Tie Straps (Item 1, Appendix D)
Cleaning Solvent (Item 6, Appendix D)
Spray Lubricant (Item 11, Appendix D)
As Required
Tools Required
Tool Kit, TI 5180-00-177-7033
Personnel Required
General Safety Instructions
MOS 63W, 2 Mechanics
Be sure you use a hoist and slings
of suitable lifting capacity to
support platform.
GO ON TO NEXT PAGE
4-88
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |