TM55-1730-228-13&P
b. After Towing.
(1) Re-engage the left rear drive wheel hub.
(a) Remove the red protective cap.
(b) Turn the handle of the lock-out mechanism to the left (counterclockwise) fully until you feel firm
resistance. Rock the wheel forward and aft until a click is heard.
(c) Reinstall the red protective cap.
(d) Do steps a, b, and c for the right rear drive wheel hub.
(2) Remove the tow bar (Figure 2-26) and store in brackets on frame. See Figure 2-25.
(3) Turn the steering bypass valve fully clockwise. See Figure 2-28.
c. Preparation For Movement By Flatbed Or Air Transport.
NOTE
If SPEMS is shipped by rail, inflate all tires to 55 psi (380 kPa).
NOTE
Reference to box in this procedure is intended to mean weather resistant corrugated box. Reference to
corrugated material is intended to mean weather resistant corrugated material.
(1) Review Final Inspection Report to be sure all items are signed off.
(2) Check Serial Plate (see para 2-16) to be sure serial number corresponds with the paper work.
(3) Disconnect and remove two spot work lights (1, Figure 2-29) located on platform guardrails and place in
space parts box.
(4) Remove one platform guardrail (2) positioned to the right of fixed access ladder. Wrap four corners with
protective material. Lay on platform deck at front putting two pieces of 2 x 4 approximately 90" (230 cm)
long under guardrail, one piece at each end. Position 2 x 4 left to right with the width of the platform
(5) Remove two end guardrail pieces (3) (23 1/2" x 42" (1.5 m x 2.2 m) and wrap four corners with protective
material. Lay on each side of platform guardrail in Step 4.
GO ON TO NEXT PAGE
2-39
|