TM55-1730-228-13&P
e. Guardrails.
NOTE
The platform guardrails for the SPEMS consist of upper and lower sections for easy removal. In some
circumstances, you will have to remove the upper section of guardrails to move the SPEMS under an
obstruction.
NOTE
If necessary, remove any chains, lights and control box from the guardrail before removing guardrail.
(1) Lift the section up to remove.
(2) Reinstall the section(s) immediately after positioning the SPEMS.
f. Telescoping Platform Ladder.
(1) To deploy ladder:
(a) Remove lock clip securing support pin. See Figure 2-18.
(b) Remove support pin and extend ladder support.
(c) Install support pin and secure with lock clip.
(d) Disconnect guardrail chains above ladder.
(e) Remove ladder lock clip. See Figure 2-19.
(f) Swing ladder over edge of platform and place the bottom rung of the INSIDE section of ladder
on the ladder support.
(g) Remove two ladder quick release locking pins (Figure 2-19) and place the bottom rung of the
OUTSIDE ladder section on rollers of ladder support (Figure 2-20). Reinstall the quick release
locking pins in the first two holes only.
(h) Reinstall guardrail chains above ladder.
NOTE
The platform may be raised, lowered and traversed with the ladder in the deployed position.
(2) To store ladder:
(a) Lower platform fully.