Click here to make tpub.com your Home Page

Page Title: SYSTEM (LONG-TERM) POWER-DOWN PROCEDURE
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-6920-737-10
SYSTEM (LONG-TERM POWER-DOWN PROCEDUR
E
This procedure describes how to perform a complete power-down of the U-COFT.
CAUTION
Equipment damage from freezing or overheating may result during periods of extreme weather conditions if the U-COFT
is completely powered-down without benefit of Administrative Storage precautions. Do not perform this procedure
without approval from organizational maintenance.
.1
Notify organizational maintenance that the system is to be completely powered-down.
1.
Make sure Electronic Equipment Power-Down Procedure has been performed (see 2-199).
1.2
In Computer Shelter, open the door of the Electronic Power Distribution Panel (A) and set the seven circuit
breakers (B) and main circuit breaker (C) to OFF.
NOTE
The Computer Shelter and Trainer Shelter Air Conditioners and overhead lighting will go off and the emergency lights will
light (battery operated) when step 2 is performed.
2.
Open the door of Utility Power Distribution Panel (1) and set the ten circuit breakers (2) to OFF position.
3.
Set main circuit breaker (3) to OFF position and close panel door.
Change 1 2-207

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business