Click here to make tpub.com your Home Page

Page Title: INSTALLATION
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-2835-255-34
TUBE ASSEMBLY AND INTERNAL PRESSURE SPECIAL SEALS (NO. 5
AND 6 BEARING OIL SCAVENGE) REPLACEMENT (Sheet 2 of 2)
INSTALLATION:
1.
INSTALL TUBE (1) AND FOUR NEW
SEALS (2, 3, 4).
a. Apply shortening to seal (2) and install
on header (5).
b. Apply oil to three seals (3, 4). Install
seals (3, 4) on tube (l).
c. Put tube (1) through hole in header (5),
position flange (6) on power turbine
assembly (7). make sure four seals (2, 3,
4) are seated.
d. Apply antiseize compound to two new
bolts-(8). Install bolts (8).
2.
TORQUE BOLTS (8) BETWEEN 45-52
LB-IN (5-6 N-m). USE TORQUE ADAPTER.
3.
WAIT 10 MINUTES AND TORQUE BOLTS
(8) BETWEEN 45-52 LB-IN (5-6 N-m). USE
TORQUE ADAPTER.
4.
APPLY ANTISEIZE COMPOUND TO
THREE BOLTS (9). INSTALL BOLTS (9)
AND WASHERS (10). TORQUE BOLTS (9)
BETWEEN 80-100 LB-IN (9-11 N-m). WIRE
FIVE BOLTS (8, 9).
5.
INSTALL TWO CLAMPS (11) ON TUBES
(12). ALINE HOLES IN CLAMPS (11) WITH
SLOT IN BRACKET (13). INSTALL SCREW
(14) AND NEW NUT (15).
6.
INSTALL, FORWARD ENGINE MODULE
WITH GEARBOX MODULE ATTACHED
End of Task
6-11

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business