Click here to make tpub.com your Home Page

Page Title: INJECTOR RACK CONTROL LEVER ADJUSTMENT.
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-2815-224-34&P
Engine Tune-Up Instructions
NOTE
Clearance required is 0.200-m. (5.08 mm).
Be sure starting aid screw is backed out enough to make it ineffective when making
adjustment. Starting aid screw is only used with engines prior to serial number
8VF-106635.
Check gap between low speed spring cap (1) and high speed spring plunger (2) using governor
(1)
gap gage.
Loosen nut (3) and adjust screw (4) to obtain proper clearance.
(2)
b. Follow-on Maintenance.
Install governor cover (para 15-4).
(1)
(2)
Adjust injector rack control lever (para 19-6).
END OF TASK
INJECTOR RACK CONTROL LEVER ADJUSTMENT.
This task covers:
a. Adjustment
b. Follow-on Maintenance
INITIAL SETUP
Equipment Condition
Models
Condition Description
TM or Para
All
Fuel injection timing
adjusted.
Test Equipment
None
Governor gap adjusted.
Buffer screw switch
Special Tools
removed.
None
Fuel modulator clamp
removed from injector
Supplies
control tube (engines
None
equipped with fuel
Personnel Required
I
modulator only).
MOS 63W, Wheel vehicle repairer (2)
Special Environmental Conditions
References
None
None
General Safety Instructions
None
Level of Maintenance
Direct Support
Change 2

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business