Click here to make tpub.com your Home Page

Page Title: Follow-on Maintenance
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-2815-224-34&P
Valve Mechanism Maintenance Instructions (Cont)
(9) Coat valve bridges (1 and 4) and valve bridge
guides (5) with lubricating oil.
(10) Install valve bridges (1 and 4) on valve bridge
guides (5) making sure grooves in bridges fit
over top of valve stem (6).
TA357689
(11) Insert 0.0015-in. feeler gage between end
of valve bridge (1) and exhaust valve
stem (7).
(12) Press down on top surface of valve
bridge (l). Feeler gage must be tight.
(13) Repeat steps (11) and (12) for other end of
valve bridge (1).
(14) Install all other valve bridges in the same
manner.
C.
Follow-on Maintenance. Install rocker arm (para 10-2).
END OF TASK
7-19

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business