Click here to make tpub.com your Home Page

Page Title: Testing-continued
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-2815-224-34&P
Engine Block Maintenance Instructions (Cont)
(12) Install two plates (18) from engine block
test kit on right and left cylinder banks of
engine block (3) with 20 head screws (19)
and spacers (20).
(13) Tighten screws (19) to 50 lb-ft (67.80 N-m)
then to 110 lb-ft (149.16 N-m).
WARNING
Be careful when using high air pressure.
Make sure connections and seals are tight
before applying pressure. High air pressure
can blow out parts, hoses, or debris with
force. Explosive force can damage equipment
and cause injury.
(14) Apply 40 psi (276 kPa) pressure to engine
block (3). Maintain this pressure for at least
two hours.
(15) After test period, inspect engine block (3)
for leaking antifreeze. If leaks are found in engine block, engine block must be replaced.
(16) Relieve 40 psi (276 kPa) pressure from engine block (3).
(1 7') Disconnect air line from fitting (17).
(18) Remove 20 screws (19), spacers (20), and
two plates (18) from engine block (3).
3-19

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business