Click here to make tpub.com your Home Page

Page Title: Supplemental Safety Instructions
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 55-4920-440-13&P
2. As soon as there is enough floor area (4), the
personnel inside will move to the expanded side of the
shelter raising the roof with extended support struts (2).
3. Once the struts (2) are totally supporting the
roof panel (1), the end walls (5) are swung open.
WARNING
The fold-out floor counterbalance cables must be secured in the cable housings prior to
raising the shelter floor from its lowered position to its level position. If the counterbalance
cables are not secured, the counterbalance cables will remain under tension. DO NOT attempt
to remove cables if the counterbalance cables are not secured. Removing cables while under
tension could cause serious injury to personnel.
4. (For shelter P/N 136-0000-101) Raise the upper
lockout plates (6) on each end wall and install upper
lockout pins (7) into the cable housings.
Change 1 2-2

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business