4920-01-139-4534">

 

Click here to make tpub.com your Home Page

Page Title: Counterbalance Cable Removal.
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 55-4920-439-13&P
d.
Counterbalance Cable Removal.
1.  After  shop  erection  is  complete  (AND
COUNTERBALANCE  CABLES  ARE  SECURED),
remove three screws (1) from cable retainer block (2).
2.  Let cable (3) and retainer block (2) hang
loose next to shelter (4).
3.
Reinstall retainer block screws (1) and
secure.
e.  Shop is now ready for reconfiguration of
equipment to operational mode.
NOTE
All equipment or tools secured to the
floor or walls of the shelter must be
carefully tightened to specific torque
limits. See Appendix F.
SECTION II. PREPARING SHOP FOR OPERATION
2-2. ECU Shelves, lowering procedures.
NOTE
(For shelter P/N 136-0000-101) One
ECU opening is located in the fold-
out end wall and one ECU opening is
located in the fold-out side wall. (For
shelter P/N 5-4-2828-1) Both ECU
openings are located in the fold-out
end walls. One ECU opening in each
fold-out end wall.
a.
Remove four plugs (1) on outside of each shelf
(2).
Change 1 2-3

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business