Click here to make tpub.com your Home Page

Page Title: Striking the shelter (cont)
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 55-4920-437-13&P
c. Two people inside the shelter, using the support
struts (1), will lower the roof panel (2) until two personnel
outside can reach and hold the weight of the roof.
d. Inside personnel will shorten the struts (1) and
secure to roof brackets (3).  They will then move into
position to assist outside personnel.
e. After all inside personnel are clear, allow the
roof panel (2) to close to the vertical position.
f. After shelter has been folded as detailed in steps a thru e and prepared in accordance with TM 10-5411-201-14,
the Propeller/Rotor Shop is ready for transport or storage.
Change 1 2-33/(2-34 blank)

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business