TM 55-4920-433-13&P
SECTION II. PREPARING SHOP FOR OPERATION
2-2. ECU Shelves, lowering procedures.
NOTE
The following procedures apply only
if the ECUs are to be installed.
NOTE
(For shelter P/N 136-0000-101) One
ECU opening is located in the fold-
out end wall and one ECU opening is
located in the fold-out side wall. (For
shelter P/N 5-4-2828-1) Both ECU
openings are located in the fold-out
end walls. One ECU opening in each
fold-out end wall.
a. Remove four plugs (1) on outside of each shelf
(2).
2-4
Change 1

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business