TM 55-4920-433-13&P
d. Counterbalance Cable Removal.
1.  After shop erection is complete (AND
COUNTERBALANCE CABLES ARE SECURED), remove
three screws (1) from cable retainer block (2).
2. Let cable (3} and retainer block (2) hang
loose next to shelter (4).
3.
Reinstall retainer block screws (1) and
secure.
e. Shop is now ready for reconfiguration of equipment to operational mode.
NOTE
All equipment or tools secured to the floor or walls of the shelter must be carefully tightened to
specific torque limits. See Appendix F.
Change 1
2-3