Click here to make tpub.com your Home Page

Page Title: INSTALLATION
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 55-4920-426-13&P
3-105
FLUID RESERVOIR REPLACE Continued
3-105
2. INSTALLATION
Position reservoir under test stand fender.
a.
Align holes in reservoir with holes in fender.
b.
Install eight bolts and flatwashers.
c.
Install eight Iockwashers and nuts on bolts and tighten.
d.
e.
Install new "O" rings on the two elbows.
f.
Install two elbows. Tighten.
Align elbow with hydraulic tubing and tighten the bottom nut on the elbow. Use 1- inch open end
g.
wrench.
h.
Install tubing nuts on elbows and tighten nut, using 1- inch open end wrench.
i.
Install sender wire.
Service with hydraulic fluid, MIL-H-5606.
j.
k.
Install access panel.
END OF TASK
3-165

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business