Section III
NAVAER 17-15C-539
3-8.
PRE-STARTING INSPECTION.
For pre-starting
3-10. MAINTENANCE IN STORAGE. Units may be stored
inspection refer to Section IV, paragraphs 4-24 and 4-25 of this
indefinitely without harm after the procedures in paragraph 3-9
handbook.
are followed. When units are stored in humid areas, they are
to be packaged in accordance with Specification MIL-P-116B,
3-9. PREPARATION FOR STORAGE AND SHIPMENT. The
method 2B. Every thirty days the humidity indicator must be
following special procedures are required prior to shipment or
checked and four desiccant bags replaced if indicator shows
storage.
need for replacement.
a.  Drain reservoir (refer to paragraph 3-7).
b.  Clean and replace vacuum and pressure sump bowls
3-11. SHIPMENT. For detailed procedures for packaging for
and filters, if necessary (refer to Section V, paragraph 5-20).
shipment, refer to Specification MIL-P-116B, method 2B.
1.
Reservoir
5.
Vacuum and Pressure
2.
Drain-fill Valve
Control Valves
3.
Drain-fill Hose
6.
Vacuum and Pressure
4.
Power Receptacle
Selector Valves
Figure 3-1. Oil Reservoir
10