Click here to make tpub.com your Home Page

Page Title: Chapter 4. Direct Support and General Support Maintenance Instructions
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 55-4920-325-14&P
CHAPTER
4
DIRECT
SUPPORT
AND
GENERAL
SUPPORT
MAINTENANCE
INSTRUCTIONS
S e c t i o n I. PREPARATION FOR MAINTENANCE, STORAGE,
AND RESHIPMENT
4-1. Preparation for Maintenance.
4-2. Preparation for Storage.
a. If test set is packed, unpack in accordance
Prepare the test set for storage in accordance
b. Inspect the test set in accordance with
4-3. Preparation for Reshipment.
Prepare the test set for reshipment in ac-
C.
Make certain proper size fuse is installed
cordance with paragraph 3-4.
in the test set prior to operation.
Section Il. CHECKOUT AND ANALYSIS
e.  Rotate Capacitance RANGE SELECTOR
4-4. Checkout Instructions.
switch (7) to X3, X10 and X50, stopping at each
The following instructions are used to de-
position. Check that CAPACITANCE INDICATOR
termine whether the test set meets minimum per-
(6) pointers do not shift from zero. If pointers shift
formance standards. Figures 4-1 through 4-8 illus-
from zero, refer to paragraph 4-23 for adjustment
trate test setup configurations and are referenced
of STRAY BAL ADJ potentiometer R120.
at appropriate points in the checkout instructions.
f. Set FUNCTION SELECTOR switch (25) to
These instructions are performed in sequence to
C A P IND HIGH CAL. CAPACITANCE lNDl-
provide complete and rapid checkout of the test
CATOR (6) shall read exact value stamped on
set,
STANDARD CAPACITOR MMF nameplate (24).
a. Set Power ON/OFF switch (2, figure 2-1)
Refer to paragraph 2-6f for calibration if CAPAC-
to OFF and connect 115 volts, 400 Hz input power
ITANCE INDICATOR (6) reading and STANDARD
to test set 115V 400 CPS connector (4) (refer to
CAPACITOR MMF nameplate (24) value are not
identical.
WARNING
g. Set FUNCTION SELECTOR switch (25) to
TEST IND PROBE SET, Capacitance RANGE SE-
Do not operate ungrounded test set.
LECTOR switch (7) to X3 and PROBE MMF range
b. Connect ground lead from test set
selector switches (28) and (29) to OFF. Release
GROUND terminal (5) to suitable ground.
PROBE 25-250 MMF control lock (26) and rotate
PROBE 25-250 MMF control (27) through entire
c. Set test set Power ON/OFF switch (2) to
range. Check that CAPACITANCE INDICATOR
ON. Check that Power ON indicator (3) lights,
(6) reads from 25 to 250 pF as PROBE 25-250
and allow five minutes for test set to warm up.
MMF control (27) is rotated from maximum coun-
d. Set CAP-RES CHECK switch (13) to CAP,
terclockwise to maximum clockwise.
Capacitance RANGE SELECTOR switch (7) to Xl
h.  Set Capacitance RANGE SELECTOR
and FUNCTION SELECTOR switch (25) to CAP
switch (7) to X1 and rotate PROBE 25-250 MMF
IND ZERO CAL. CAPACITANCE INDICATOR (6)
control (27) until CAPACITANCE INDICATOR (6)
shall read 0 pF. Refer to paragraph 2-6f for cal-
reads 30 pF and set PROBE 25-250 MMF control
ibration if CAPACITANCE INDICATOR does not
lock (26). Set PROBE MMF range selector switch
read exactly zero.
4-1

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business