Click here to make tpub.com your Home Page

Page Title: UH-1C, UH-1E, UH-1L, UH-1M, AH-1J, TH-1L, TH-1G, and AH-1G Main Rotor Hub Assembly (540 Series Hub) Balance Check (cont)
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 55-4920-201-14
work stand and adjacent objects, and note balance
i. Install spacer (13) over lower end of arbor;
condition indicated at top end of arbor.
install handwheel (14) in lower end of arbor and
tighten to clamp both legs of yoke firmly against
NOTE
top surfaces of hub yoke.
In order to insure that hand wheel (14,
figure 4-20) suspends free of interference
j. Using gage (10) as shown, adjust rotor hub
within the inside diameter of the stand
drag struts to symmetrical angular positons using
table, it may be necessary to adjust the level
gage outer position (12). Remove gage from rotor
of the stand assembly by installing suitable
hub during subsequent balance check.
blocks under the two tubular stand legs.
k. Install quick-disconnect assembly with
NOTE
3/16-inch cable (7A050 kit) on arbor suspension
For balance tolerance and application of
rod and hoist balancing assembly approximately
inch off work stand. Check to insure that
balance corrections, refer to applicable
suspended assembly is free from interference with
helicopter  manual.
4-32

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business