Click here to make tpub.com your Home Page

Page Title: Figure 4-3. Tiedown diagram for HMMWV in C-141 aircraft.
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

25 August 1988
TM 55-2320-280-14
LEGEND:
C-130 AIRCRAFT
o
10,000 POUND CAPACITY TIEDOWN FITTING
25,000 POUND CAPACITY TIEDOWN FITTING
NOTE: FLOOR TIEDOWN FITTINGS ARE LOCATED IN ROWS A THROUGH G AND COLUMNS 1 THROUGH 25.
THE RAMP HAS 5 ADDITIONAL COLUMNS. THIS IS A TYPICAL TIEDOWN PROCEDURE AND ONLY
COLUMNS 1 THROUGH 25 ARE SHOWN. ITEM BEING SHIPPED CAN BE TIED DOWN AT ANY LOC A-
TION APPROVED BY THE LOADMASTER.
Figure 4-2. Tiedown diagram for HMMWV in C-130 aircraft.
LEGEND:
C-141 AIRCRAFT
o
10,000 POUND CAPACITY TIEDOWN FITTING
25,000 POUND CAPACITY TIEDOWN FITTING
NOTE: FLOOR TIEDOWN FITTINGS ARE LOCATED IN ROWS A THROUGH G ANC COLUMNS 1 THROUGH 56.
THE RAMP HAS 6 ADDITIONAL COLUMNS. THIS IS A TYPICAL TIEDOWN PROCEDURE AND ONLY
COLUMNS 15 THROUGH 42 ARE SHOWN. ITEM BEING SHIPPED CAN BE TIED DOWN AT ANY L O-
CATION APPROVED BY THE LOADMASTER.
Figure 4-3. Tiedown diagram for HMMWV in C-141 aircraft.
4-3

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business