Click here to make tpub.com your Home Page

Page Title: Table 2-2. Operator/Crew Preventative Maintenance Checks and Services (cont)
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 55-1915-200-10
B
Table 2-2. Operator/Crew Preventative Maintenance Checks and Services
EQUIPMENT NOT READY/AVAILABLE
- BEFORE D - DURING A - AFTER W - WEEKLY M - MONTHLY Q - QUARTERLY S/A SEMI ANNUALLY AN - ANNUALLY
IF
T/A - TRIENNIALLY
ITEM
B
D
AWM
Q S/A AN T/A
ITEMS TO BE INSPECTED
CHECK FOR
ACTION
PMC
NMC
NUMBER
X
Check for unusual vibrations.
Troubleshoot and refer to
Shaft is misaligned or
38
Propeller and Propeller
higher level of maintenance
bent. Propeller blades
Shaft
for repair or replacement.
are bent or damaged
or cutlass bearing is
excessively worn.
39
Engine Controls and
Indicators
Inspect the engine console for proper operation of Troubleshoot,
X
X
X
Engine Room Console
repair/replace as
throttle control system, all indicators, pressure
monitoring system, engine exhaust temperature  necessary.
system and test alarm indicator lamps for
operation. Refer to Chapter 2, Section I, Table 2-
Troubleshoot,
X
X
X
Pilothouse Console
Inspect the pilothouse console for proper
repair/replace as
operation of the throttle control system, all
indicators and test alarm indicator lamp. Refer to necessary.
Chapter 2, Section I, Table 2-1, Figure 2-9.
X
Steering Gear and Linkage Inspect steering gear and linkage for broken or
Repair/replace as
Steering gear does not
40
worn parts.
necessary.
operate smoothly.
X
Lubricate motor bearings every 400 hours or 6
Repair/replace as
One pump
Both pumps
41
Bilge Pumps
months. Lube impeller shaft bearings. Check shaft necessary.
inoperative
inoperative
packing.
X
Visually inspect pumps for leaks, loose
Repair/replace as
Pump is inoperative.
42
Ballast Pump
connections and damage. Lubricate motor
necessary.
bearings every 6 months. Check Packing Gland.
X
X
XX
Visually inspect pumps for leaks, loose
Repair/replace as
Pump is defective
43
Sludge Pump
connections and damage.
necessary.
X
X
XX
Visually inspect pumps for leaks, loose
Repair/replace as
One pump
Both pumps
44
Prelube Oil Pumps
connections and damage.
necessary.
inoperative
inoperative
LSV PMCS
Change 12
2-271

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business