Click here to make tpub.com your Home Page

Page Title: Deprocessing Unpacked Equipment.
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 55-1905-223-24-4
4-5. Deprocessing Unpacked Equipment.
a. Remove protective caps, plugs, inserts, wrappings, and tape when inspection/inventory is completed. Inspect
piping openings for damage. Wipe off dirt, grease, or protective films at time of installation.
b. Remove chocks from resilient mounted components.
4-6. Operational Procedures.
a. Initial Setup Procedure. Includes operational checks and inspections that are not performed for a routine startup.
Direct support maintenance personnel will perform initial setup in accordance with the operator's manual, TM 55-
1905-223-10.
b. Normal Startup. Refer to the operator's manuals TM 55-1'905-223-10.
c.
Shutdown Procedure (Usual or Unusual). Refer to the operator's manual, TM 55-1905-223t10.
Section III. INTERMEDIATE GENERAL SUPPORT PREVENTIVE
MAINTENANCE CHECKS AND SERVICES (PMCS)
There is no PMCS at the general support level. See Chapter 2, Section III.
Section IV. INTERMEDIATE GENERAL SUPPORT TROUBLESHOOTING
There is no troubleshooting at the general support level. See Chapter 2, Section IV.
4-2

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business