Click here to make tpub.com your Home Page

Page Title: Replace/Repair Cylinder Head Group. (FIGURES 2-40 and 2-41)
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 55-1905-223-24-4
2-40. Replace/Repair Cylinder Head Group. (FIGURES 2-40 and 2-41)
This task covers:
a. Removal,
b. Repair,
c. Replacement.
INITIAL SETUP
Tools
Equipment Condition
Tool kit, general mechanic's
Power supply disconnected and tagged
rail and marine diesel engines,
"Out of Service".
Starter motor cable disconnected.
Torque wrench kit P/N 3377216
Fuel supply shut off. Fuel drained.
Lifting sling P/N 3375958
Coolant drained.
Combination wrench set, metric
Air cleaner removed (para. 2-25).
10mm thru 24mm,
Turbocharger removed (para. 2-26).
5120-01-046-4979
Fuel plumbing removed (para. 2-30).
Valve covers removed (para. 2-37).
Materials/Parts
Rocker levers removed (para. 2-38).
Fuel injectors removed (para. 2-39).
Gasket P/N 3907054
Warning tags, Item 21, Appendix C
Coolant, Item 4, Appendix C
WARNING
This procedure requires two soldiers.
REMOVAL
a. Remove the remaining 14 head bolts (1, 2, FIGURE 2-41) working from the center to the ends of the cylinder
head.
b. Remove cylinder head (3). Weight 80 lb (36 kg).
c.
Remove cylinder head gasket (4) from the block. Discard gasket.
REPLACEMENT
CAUTION
Make sure the cylinder head and block surface are clean and not nicked or gouged.
Change 1
2-102

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business