Click here to make tpub.com your Home Page

Page Title: Preparation For Movement By Flatbed Or Air Transport.
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM155-1730-228-13&P
(6) Remove two single post with chains (4) that are located left of platform fixed access ladder. Wrap each
end with protective material and place beside the two guardrails listed in Step 5. Slide the pockets over
ends of guardrails to prevent them from moving.
(7) Remove two extendable deck side guardrails (5) (60" x 44" (150 x 112 cm)), wrap four corners with
protective material, and lay left to right as shown on middle of platform.
(8) Remove center guardrail (6) (22" x 47" (55 x 120 cm)) and lay between two guardrails in Step 7 on top of
two pieces of 2 x 4 wood 23" (58 cm)) long one piece at each end. Position wood front to rear.
(9) Remove two inside front guardrails (7) (42 1/2" x 58" (108 cm x 147 cm)), wrap four corners with the
protective material, and lay on top of guardrails in Step 7.
(10) Remove two piece left rear guardrail (8) (47 1/2" x 97" (120 cm x 246 cm)) and wrap with protective
material at points where contact with (47 1/2" x 97" (120 cm x 246 cm)) guardrails will be made. Lay these
guardrails atop the other two as shown.
(11) Remove rear kickplate (9) and wrap both ends with protective material. With face opening downward,
secure to kickplate in Step 10.
(12) Remove two single rear end rails (10) and wrap both pieces together with protective material in shape of
an "I". Lay guardrails between the guardrail in Step 10, on deck.
(13) Place two pieces of 2 x 4 (11) approximately 60" (152 cm) long across guardrails at rear of stack, left to
right.
(14) Place one 2 x 4 (12) approximately 48" (122 cm) long on top of stacked guardrails in front. Place a second
2 x 4 approximately 96" (244 cm) long on top of the first piece. Position the 2 x 4 left to right for metal
bands.
(15) Wrap all loose chains with protective material and tape to guardrails.
(16) Place two 3/4" steel bands (13) 7'0" (213 cm) long on both sides of platform around two 2 x 4 in Step 4,
making a loop from top of stacked guardrails to underside of 2 x 4 on platform.
(17) Place one 3/4" steel band (14) 18'0" (548 cm) long at front of platform making a loop running the width of
the platform around top side of stacked 2 x 4 (Step 13) to bottom side of platform.
(18) Place two 3/4" steel bands (15) 17'0" (518 cm) at front of platform, making a loop running the width of the
platform around top side of 60" (152 cm) long 2 x 4 (Step 13) to bottom side of platform.
(19) Using nylon filament tape (16), secure scissor spreader (17) in its hanger using two wraps each side.
GO ON TO NEXT PAGE
2-40

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business